Listed at $640,000

Interested in this yacht? Contact Us

I understand that by signing up I agree with 26 North’s Privacy Policy.


Available for SaleChange Order31' 2025 Regulator 

  • Loaded with Custom options and ready to fish, Professionally rigged with all options:
  • Legendary Regulator Ride with Full Option package- partial option list below
  • Storm Gray Hull Color
  • Storm Gray Bracket, Flexi Teak on Motor Bracket
  • Storm Gray underside of T-top
  • Storm Gray Underside of Buggy Top
  • Twin 450hp Yamaha engines, 70 hrs, Transferrable Warranty until 3/1/2032
  • Cockpit freshwater engine flushing option
  • Yamaha Helm Master Plus at both stations
  • Yamaha Integrated Autopilot with Auto-Routing
  • SeaKeeper Ride Automatic Trim Tab System
  • SeaKeeper 2 Gyro Ready (cradle is mounted beneath the Helm Seat)
  • 3x Deluxe Mezzanine Tackle Center
  • Triple Axle AmeraTrail trailer with all Upgrades (in the water twice)
  • Custom Tower with full upper control station, Trailerable. Warped ladder design stays tight to the Mezz seat, (4) rod holders per side, plus 3 additional rod holders across the back, (2) stereo speakers, (2) 12 v electric reel plugs, Carbon fiber tilt steering wheel, LED Light bar, Cup Holders, Forward "Cobas Casting" rod holders. Buggy Top with Starlink antenna on top, Custom painted Black, underside Gray.
  • Barrier Coated and Bottom Painted with Custom painted Horizontal Boot Stripe
  • Thru Stem Anchor Windlass with all chain rode, freshwater anchor wash down
  • Dove Gray and White Quilted Upholstery Option
  • Upholstery Covers for Front seat, Dash and Helm Seat (Deep Gray Sunbrella)
  • Garmin HD Navigation package with (2) 8616 touch screens, (1) 8612 on tower
  • Garmin GMR Fantom 54 xHD 4kw Radar antenna
  • CHIRP Transducer
  • (3) Garmin 215 VHF Radios, one at tower
  • LED LightBar (Factory Option)
  • 2nd LED Lightbar on custom tower
  • Starlink Wifi system with inverter
  • 110v Battery Charger (Factory Option)
  • Full Factory 3 sided Curtain Package (still in the box)
  • Factory Gaff holder option
  • Fusion Apollo 770 Stereo with Entertainment upgrade, (2) JL Audio Amps, JL Subwoofer, plus 10 JL Audio backlit LED Speakers, AM/FM/Bluetooth/Apple Airplay2/SXM Capable
  • Garmin GMR54 SiriusXM Marine Weather Receiver
  • (2) Inductive cell phone chargers
  • T-top Rocket Launcher
  • Gemlux Bluewater Outrigger Elbows with 22' Carbon Fiber collapsible outrigger poles (Professionally rigged)
  • MultiColor Underwater LED Lights
  • (8) Additional forward Cupholder/Rod Holder, Gemlux No-Bolt
  • (2) Additional aft rod holders, Gemlux No-Bolt
  • Gray Regulator helm standing pad, at main helm station
  • Gray Seadeck standing pad for Tower
  • Custom Gray Tower Upholstery with Regulator Logo Embroidered
  • Forward Sunshade with Carbon Fiber poles (Deep Gray) still in the box
  • Lazarette Bucket Holder Option
  • (2) Hose Coils (one for Freshwater, one for Raw water)
  • Forward seat cushions stored inside of the Console
  • Fresh water electric flushing toilet inside of the Console
  • Freshwater sink inside of the Console
  • 12 volt light inside of the Console
  • Plus all of the Regulator Standard features

26 North Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Bluewater Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel

Specifications

LOA: 31' (10 m)
Beam: 10' (4 m)
Hull Material: Fiberglass
Fuel Capacity: 300 gal (1,136 L)
Fresh Water Capacity: 35 gal (133 L)
Holding Tank: 6 gal (23 L)
Location: Hampton, United States, Virginia
Build Year: 2025
Builder: Regulator
Model: 31
Type: Center Consoles
Cruising Speed: 35 Knots
Max Speed: 58 Knots
Engine Information:
  • Engine Make: Yamaha
  • Engine Model: Twin XF450
  • Engine Year: 2025
  • Engine Type: Outboard
  • Power (HP): 450.00
  • Power (KW): 335.56
  • Fuel Type: Gas/Petrol
  • Hours: 70.00
  • Engine Location:

Details

Trailer Info

  • 2025 AmeraTrail model 3032TTPB
  • 21,000 lb GVWR
  • Triple Torsion Axle Aluminum I-Beam trailer with forward Target Bunks
  • Stainless steel hardware package
  • LED Light Package
  • Electric over Hydraulic Brakes (disk brakes on all 3 axles)
  • Aluminum Wheels for all 7 tires (including spare)
  • Spare Tire mount with Spare Hub assembly
  • all tires are 235x16 ER Radial tires
  • Vee Stop bow catcher
  • Heavy Duty Jack Stand
  • PVC Guide Poles

Listing MLS by Yachtr.com

Talk to usContactOur Team 

I understand that by signing up I agree with 26 North’s Privacy Policy.



Sign up forYoga On the DocksTuesdays at 8 AM 

I understand that by signing up I agree with 26 North’s Privacy Policy.