Listed at $899,000
Available for SaleSEAQUEST92' 1996 Hatteras
Powered by Twin Deutz TBD620 V-16 Main Engines which produced 2700 hp each, this Hatteras 92' is the largest and most highly optioned Hatteras Sportfish in the world.
Featuring a 4-stateroom layout with private Crew Quarters aft, an On-Deck Galley, an oversized Salon, an Aft Deck, and a luxurious Skylounge, she cruises comfortably at 25 knots with a top-end speed of 29 knots. The main engines were rebuilt in 2012 and have had 285 SMOH. In addition, the vessel has completed a new and upgraded interior which includes new soft goods, carpeting, furnishing, artwork, and accessories throughout which allows for complete comfort while cruising and is totally fish-rigged.
26 North Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by Merle Wood & Associates. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel
Specifications
LOA: | 92' (29 m) |
Beam: | 20' (7 m) |
Hull Material: | Fiberglass |
Fuel Capacity: | 4,963 gal (18,787 L) |
Fresh Water Capacity: | 840 gal (3,180 L) |
Flag: | Cayman Islands |
Location: | Florida, FT. LAUDERDALE, United States |
Build Year: | 1996 |
Builder: | Hatteras |
Type: | Motor Yachts |
Cruising Speed: | 25 Knots |
Max Speed: | 29 Knots |
Engine Information: |
|
Details
INTERIOR
• The complete interior (over $500,000) was completed in 2012 by Karen Lynn
• UPDATED in September 2017 by Patrick Knowles Designs
MAIN SALON
• Entertainment center w/ 42" flat-screen TV, Yamaha receiver and amplifier, Nuvo home video system, Indeka DVD receivers
• SMX A/C controls
• Custom upholstered leatherette sofa to starboard (08/2011)
• Murray Brothers high-gloss cocktail table
• Custom overhead soffit w/ lighting
• Custom geometric beige carpeting throughout (08/2011)
• Upholstered lambrequins (08/2011)
• (2) Oversized club upholstered chairs to port (08/2011)
• Decorative marlin table lamp (08/2011)
• Curved stairwell to sky lounge
• Wood mini blinds throughout
• Wet bar with sink, Kitchen Aide icemaker, overhead glass, and bottle storage
DAY HEAD
• Microphor head
• Vanity w/ granite top and circular sink
• Marble flooring
• Wall covering (09/2017)
GALLEY
• Sub-Zero refrigerator/freezer (2012)
• KAD 18" Icemaker (2012)
• KAD 2.0CF Microhood Combo (2012)
• KAD 24" Dishwasher (2012)
• Gaggenau 24" electric Cooktop (2012)
• Gaggenau 24" BI SGL Oven (2012)
• All upgraded appliances - (08/2011)
• Black granite countertops
• Marble flooring
• Large upholstered U-shaped dinette w/ table (08/2011)
• Upholstered lambrequins and wood mini blinds
• Large pantry
• Kitchen Aid trash compactor
• Kitchen Aid microwave oven
• Double recessed sink
• In-Sink-Aerator garbage disposal
• Sony 13" TV in an overhead cabinet
• Stairwell forward down to staterooms
ACCOMODATIONS
MASTER STATEROOM
• King-size berth with upholstered headboard and storage drawers below
• (2) Built-in nightstands with (2) new shell lamps
• Built-in dresser w/ ample drawer space
• Upgraded Zeno mattress, new coverlet, shams, and pillows (08/2011)
• Mirrored bulkhead
• (2) Cedar-lined walk-in hanging lockers
• Built-in safe in closet
• Custom pleated Roman shades (08/2011)
• SMX A/C controls
• Entertainment center with Sony 21" flat-screen TV
• Private bath w/ marble flooring, Corian vanity top, Jacuzzi tub/shower enclosure, new mirror, wallcovering and head enclosure (08/2011)
VIP STATEROOM
• Queen berth centerline with drawer storage below
• Zeno mattress, coverlet, shams and pillows (08/2011)
• Mirrored bulkhead
• (2) Starfish lamps (08/2011)
• Built-in cabinets with drawer storage
• Overhead lighting
• Escape hatch
• SMX A/C controls
• Sony TV & DVD player
• Private head w/vanity, shower, wall covering, Amtico flooring (08/2011)
(2) TWIN GUEST STATEROOMS
• Port and starboard
• Twin berths in each stateroom - which slide together converting to a double
• Zeno mattress, coverlets, shams, and pillows (08/2011)
• Built-in dresser and nightstand
• Mirrored bulkhead
• Private bath with vanity, shower, wall covering, and Amtico flooring (08/2011)
LOWER COMPANIONWAY
- Thin twin washer/dryer
- Central vacuum system
- Cedar-lined linen locker
SKYLOUNGE AND HELM STATION
- Aft of the skylounge through double glass doors to the upper deck
- Aft control station
- (3) Grosfillex folding chairs
- Stainless steel ladder up to flybridge
- Control station on bridge with windscreen
- Additional seating
- Stainless steel rails and stanchions
- Flybridge radar arch
FLYBRIDGE & UPPER DECK
• Aft of the skylounge through double glass doors to the upper deck
• Aft control station
• (3) Grossfilex folding chairs
• Stainless steel ladder up to flybridge
• Control station on bridge with windscreen
• Additional seating
• Stainless steel rails and stanchions
• Flybridge radar arch
AFT DECK
• U-Shaped bench seating
• (4) Gloster teak folding chairs
• Murray Brothers hi-gloss bow-shaped teak table
• New none-skid decks (01/2023)
• Fold-down ladder to bridge
• Wet bar with sink and storage to starboard
• U-Line refrigerator in cabinet to port (2017)
• CCTV security camera
• Overhead speakers
• Rocket launcher with (9) rod holders
COCKPIT
• Coaming gate
• Molded in transom fish box
• Transom door
• Storage cabinets with (2) sets tackle drawers
• Refrigerated fish box on deck
• Cockpit coaming lights
• Swim platform with ladder
• Seawater and freshwater wash-down
• Front-loading refrigerator/freezer
• Access door to engine room and crew quarters
• Mini hot tub under deck
• Deck lounge
• Aft deck speakers with controls
• Telephone/CATV inlets
• Omni DDS TV antenna
ELECTRONICS AND NAVIGATION EQUIPMENT
• Cameras (2012)
• LCD Monitors in PH (2012)
• Satellite TV System (2012)
• (2) New ACR - RCL search lights (2012)
• Replaced Trivoli lighting throughout the vessel
• Replaced Stbd. radar with radar/plotter: NavNet3D Black Box multi-function processor/chart plotter includes US charts
• Nauticomp 19" Titan Marine Monitor 100V AC 24VDC- for radar
• Furano DRS12A 12Kw, 72 n.m. Digital radar for the NanNet3D, less 4' or 6' Antenna
• Furano XN13A/6 6Ft Antenna Open Array
• GPS Furano GP330B GPS/WAAS Sensor - NMEA2000
• Furuno Nav. Net Radar Plotter (2012)
• New Simrad Autopilot AP9 (2012)
• Northstar 952X GPS
• Northstar 941X GPS
• (2) Furuno Anritsu 72-mile radars
• B&G water temp/distance log and depth finder
• American bow thruster
• Standard hailer
• Naiad stabilizers
• Toshiba intercom
• Joystick remote on helm chair
DECK EQUIPMENT
• MarQuipt 2500lb low profile davit
• (2) x Freshwater wash-down systems
• (2) x Seawater wash-down systems
• (3) x Windshield washers and wipers
• (2) x Anchors
• Maxwell 4500 windlass
• Anchor lines
• Retractable shore cords
• Switlik life raft (excluded from sale)
• Wet bar with icemaker and refrigerator
• Bottle and glass storage
• Cruisair chilled water A/C system
• Dual air horn
• Mounting chocks
• Phone/CATV inlets
• Omni DDS TV antenna
• ACR remote control searchlight
• Life jackets
• New 12-man life raft (2017)
ELECTRICAL SYSTEM
• AT- Sea AC Converter (2012)
• 24-Volt system
• (2) Single 100-amp cord/cable masters
ENGINE / MECHANICAL EQUIPMENT
- Twin Deutz TBD620 V-16 Main Engines (#209 and #210) 2700 hp each – 285 Hrs. since rebuilt
- Complete cylinder liners, pistons, and bearing rebuild by Marine Diesel Service 285 Hrs. ago. At a cost of $450,000 (2011)
- Range - 1000 Miles at 12 knots – Including generators
- Fuel burn:
RPM SPEED TOTAL GAL/BOTH ENGINES
1000 12 knots 46
1200 15 knots 80
1300 19 knots 97
1400 21 knots 116
Full RPM speed 29 KNTS
- Northern Light 38Kw generators (New - 2012)
- Port generator hours: 316 (05/22/2024)
- Starboard generator hours: 121 (05/22/2024)
- Power Take-Off for Bow Thruster (2012)
- Northern Light 38Kw generators (New - 2012)
t Port generator hours: 316 (05/22/2024)
Starboard generator hours: 121 (05/22/2024)
- Power Take-Off for Bow Thruster (2012)
- Water Marker membranes (10 Hrs. ago) (2017)
- Replaced "ALL" hydraulic hoses throughout the boat (2012)
- Replaced Icemakers (2012)
- Exhausts rebuilt by Metcalf Marine Exhaust for $130,000 (2023)
- New Cruisair A/C system (2012)
- All new air handlers throughout (08/2011)
- Naiad stabilizers
- American bow thruster
- New ships monitor system with new display screen
- Sturdy engine synchronizers
- Fuel prime system
- Oil change system
- ZF transmissions 3.2.1 reduction
- Racor fuel filters
- Hydraulic power steering
- Delta-T engine room ventilator
- Water makers 1500 GPD water maker
- Vulkan coupling (08/2011)
- Exhaust stainless steel covers (08/2011)
- Fire extinguishers
- Fire extinguishers re-certified
UPGRADES
September 2017
• Installed Furuno GP170 GPS NAVIGATOR W/O DGPS
• Shakespeare 390 SSB Antenna 23FT
• Shakespeare 5208 – R VHF Antenna 23FT
• New water maker membranes
• New water heater
• New fire extinguishers and engine room suppression system
October 2017
• Work done on the air-conditioning system on board
November 2017
• Aft Deck ice maker
• Spray Rail repairs
• Rebuilt steps to the crew quarters
• Replace battery condition meter on the distribution panel #2
December 2017
• Hull Waved
• Bottom Painted
• Sanded and stained teak
• Some new interiors in the main salon
• Davit repairs/service
• New stabilizer seals
• New caulking around bridge windows
• New Hatches on the bow
• New deck lighting, main deck, and cockpit
• Engine room bilge tanks cleaned
• Replaced 4- 80 batteries on the port side
• The Port Shore power converters unit was rebuilt
• Replaced the ballast in the port inboard aft e/r fluorescent light
• The engine room bilges were cleaned by MWM
• The tender davit was rebuilt by Signature Marine
January 2018
• Interior deep cleaning
• New interior wall panels
• Carpets professionally cleaned
• New chairs and pillows in the salon
• Engine room cleaned and detailed
• New davit motor
• New paint job on Davit
• New life raft
• Various new fresh and raw water pumps
• Compound and whole boat wax
• Cockpit bilge tanks cleaned
• Refinished teak decks
• Various paint touch-ups
• Engine alignment
• Propellers removed, reinstalled, balanced
• Shafts pulled and Rebedded, new shaft seals
• The strut bolt was leaking and had to be replaced
• All halogen lights in the cockpit step light were replaced with LED
• The cockpit flood light was removed and repaired
• Replaced light in the cockpit grill with 230-vac bulbs
• BMC replaced some of the formic in the crew area
• The shaft bearings were replaced
• The rudder bearings were replaced
• Bradford removed the bridge toilet for repair
• The paddle wheel was replaced on the B&G speed log
• Replaced the pressure switch on the port generator heat exchanger
• Replaced the fuel booster pump on the Stbd. generator
• Replaced the bilge pump in the crew cabin
• Rebuilt the #1Racer filter in the transfer system
• Replaced all the DC halogen lights in the engine room with LED
February 2018
• The wood base under the generator was replaced
• Work done on the exhaust system
• The hydraulic hoses for the stabilizers were replaced by Mendel Marine
• Most of the hoses were replaced on the steering system by Mendel Marine
• Both main engine fuel coolers were cleaned using Barnacle Buster
• The Port main engine crossover was removed by Metcalf Marine
March 2018
• Repaired the port engine room exhaust fan
• Rebuilt the port crew bilge control box
• Replaced all the bolts and gaskets on the port gearbox oil coolers
• Replaced the control switch on the Stbd. shore cord storage system controller
• Replaced the 3" check valve on the port main engine
• Repair damaged wire on the front outboard port main engine
• Replaced all the bolts and gaskets on the Stbd. gearbox oil coolers
• Replaced broken and damaged cushion clamps outboard of the port gearbox
• Repaired damaged power cable to the Stbd. guest toilet
• Installed a new flush timer on the Stbd. guest toilet
May 2018
• Repair made to VIP toilet discharge line
• Reinstalled rope light outside port wheelhouse windows
• Metcalf was removed from the Stbd. crossover pipe and mixer
• Turbo rings were removed so they could be refurbished
• The Stbd. exhaust fan was removed so that the air plenum could be repaired
• New thermostat in the crew area
June 2018
• Both generator heat exchangers were cleaned using Barnacle Buster
• Plug replaced on port aux gear control. Tess Marine Electric
• Replaced the crew toilet water solenoid valve
• Replaced relay on crew toilet macerator pump
• Rebuilt crew macerator pump
July 2018
• Install a new compensator on Stbd. exhaust in the crew area
• Install new temperature switches in the fiberglass exhaust pipes in the crew area
• Metcalf installs Stbd. crossover pipe and stainless-steel crush ring
August 2018
• Replaced the air conditioning compressor for the lower staterooms
• Replaced Stbd. battery charger by Tess Electric
• Replaced the stainless-steel braided hose to the mixer gauges
• Metcalf Maine installed a new turbo ring to the Stbd. main engine
September 2018
• Cleaned Port main engine plates plate cooler
• The Port stabilizer potentiometer was replaced
• The Stbd. Stabilizer was tested and found to be OK
• New batteries were installed on the Stbd. side
October 2018
• New electric fuel pump on the main generator
• New heat exchanger on the port generator
• New pump and motor replaced on the #1 air conditioning raw water pump
• New tachometer installed on the Stbd. main engine
January 2019
• Added AIS System Furuno F170
February 2019
• Cleaned and Serviced Port Engine Injectors
• New Sea Power Converter
September 2019
• Replaced the Port side Delta T fan
August 2020
• New bottom paint
• All new thru-hull sea valves
• Stabilizers were serviced
• New Steering hoses and Steering pump seals
• Engines and Generators were fully serviced
• New crew area flooring
January 2021
• New and rebuilt engine monitors and shutdown
• Removal of cockpit and swim platform teak decks - replaced with non-skid decks
November 2022
• Entire new main engine exhaust by Design Engineered Solutions (D.E.S)
• New exhaust spray rings by D' Angelo Exhaust
• Upgraded and renewed aft deck teak
• Fire equipment updated by Fireline
• Steering lines - New 10/22
• New handlers and compressors for VIP, Stbd., twin, galley, and port twin
January 2023
• New non-skid on the aft deck
• All new fans and damper controls in engine room
February 2023
• Recertification of fire equipment
• New $130,000 exhaust by Design Engineered Solutions (D.E.S)
• New exhaust spray rings by D' Angelo Exhaust
• (2) new $30,000 AC compressors for the galley and staterooms
January 2024
• All new smoke detectors
• New House batteries
• (3) new bow thruster joy sticks
October 2024
• Bottom Paint and ProSpeed
Listing MLS by Yachtr.com